Project Description:

This state-of-the-art rail operating centre is one of 12 which will eventually control large parts of the railway, replacing more than 800 signal boxes and other operational locations currently used to control trains.

The three storey building was designed to provide operational, administration, training and accommodation for staff facilities. The gross internal floor area of the building is 6,895m2 inclusive of roof level plant room and storage. The building operates 24/7 accommodating at its peak up to 180 staff working in three shifts.