+44 (0)20 8662 2200

Services:

CDM Advisor

Project Description:

Current projects include:

Premises Management Projects
The projects are various premises management and replacement projects that have taken place to the existing built environment within the airport. Some of the projects are in very busy customer facing areas within terminals and others are building management projects which take place away from members of the public. 

Explosive Detection System
The EDS Standard 3 programme of projects contains thirteen inter-related projects to replace existing EDS Standard 2 hold baggage screening machines with the new EDS Standard 3 hold baggage screening machines.

Mechanical and Electrical Infrastructure Projects
The main project is to decentralise the existing central boiler system at Gatwick Airport. The existing system is end of life and additional resilience and functionality is required throughout the airport. The project was supported by a significant number of additional related infrastructure projects to plant rooms, gas mains, electrical distribution systems and associated HVAC.

Back to Transport and Infrastructure