+44 (0)20 8662 2200

Services:

Cost Consultancy and Employer's Agent

Project Description:

Projects include:

  • Multi-Storey Car Park

    The scheme consists of the addition of a further two floors of parking above the existing multi-storey car park to provide an additional 750 parking spaces. It forms part of the first stage of a wider transformation of the passenger car parking at the airport.

  • Silverzone Road Widening
    Resurfacing/realignment of an existing access road, renewal of existing services, signage, road markings and electrical services together with the construction of a bus waiting area. The works are enabling works for a wider reorganisation of the airport parking facility.

  • CRCC Enabling Works
    Diversion of a pumped main foul water sewer and construction of a reinforced concrete HGV parking area with associated drainage. The works are enabling works for a wider reorganisation of the airport car rental facilities.

  • Bus Waiting Building
    Incorporated into Silverzone Road Widening.

  • Northside House
    Refurbishment and re-configuration of an existing office including changing the security arrangements from landside to airside.

Back to Transport and Infrastructure