Projects include:

  • Haddow Building Refurbishment and Services Upgrade
    Works included the replacement of distribution boards, refurbishment of internal AHUs, upgrade controls as necessary, replace fire alarm systems in all buildings, building generator connections and replacement of external lighting including overhaul of controls to fume cupboard systems.

  • Generator Replacement at CBL Fulham Road
    Works included the de-commissioning and dismantling of an existing 500kva generator (to be re-installed at the ICR Sutton facility) followed by the installation of a new 1,000kva generator. Additional works involved the installation of temporary generator units to facilitate the changeover which included all mechanical and electrical enabling works.

  • IT Upgrade, CBL Fulham Road
    Works included the upgrade of CBL Building HPC server with SGE and ICE rack installation together with associated floor strengthening and associated service installation and enabling works.

  • AHU Upgrade Project, Brookes Lawley Building
    Works included the upgrade of existing Air Handling Units, which were installed within the lower ground floor area server room together with the installation of second floor roof mounted condensing units and with all associated mechanical and electrical enabling works.